Rename a modern report
You can change the internal and external names of a report.
Each report has two names you can modify, as needed:
- The internal name is used to clearly identify the purpose of the report to internal stakeholders, and to distinguish it from other reports in a survey. By default, the internal name is the same as the survey name.
- The external name is used to describe the report for external stakeholders. By default, the external name is "Untitled Report".
You can change either, or both, of these report names.
-
To change the internal report name:
-
To change the external report name: